Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
10 changes: 5 additions & 5 deletions TODO.md
Original file line number Diff line number Diff line change
Expand Up @@ -9,11 +9,6 @@

## Backlog tickets

- [ ] [`ticket-062`](project/ticket-062/README.md) — route the unowned Python
SDK bridge test through protected governance evolution. Current state:
`IN_PROGRESS / EDIT`; protected review exposed and is repairing stale
reusable-workflow caller pins after exact-SHA adoption; coordinated by
ticket-058.
- [ ] [`ticket-058`](project/ticket-058/README.md) — synchronize release,
runtime, SDK and generated-provenance version identity and add a deterministic
drift gate. Plan and owner-ticket creation are approved; current state:
Expand All @@ -26,6 +21,11 @@
Current state: `PLAN / WAIT_FOR_APPROVAL`.

## Completed tickets
- [x] [`ticket-062`](project/ticket-062/README.md) — adopted immutable
new-project v0.14.0 at exact SHA `a22eb47`, preserved all eight target
workstreams, assigned `test/python-runtime.test.ts` to `sdk`, aligned the
reusable workflow caller and passed protected PR #77. Current state:
`DONE / DONE`; merge `main@a762580`.
- [x] [`ticket-055`](project/ticket-055/README.md) — identifies OpenRouter
usage with explicit `OPENROUTER_APP_NAME`, falling back to the analysed
project's folder name. Koru, Validator App and protected checks approved
Expand Down
21 changes: 15 additions & 6 deletions project/ticket-062/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,8 +2,8 @@

- **ID**: ticket-062
- **Owner**: agent:codex
- **Status**: IN_PROGRESS
- **Workflow state**: EDIT
- **Status**: DONE
- **Workflow state**: DONE
- **Created**: 2026-08-08

## Goal and scope
Expand All @@ -23,7 +23,7 @@ the required upstream extension/adoption instead of modifying authority.
governance adoption path.
- [x] AC-02: A published governance mechanism assigns the Python runtime bridge
test to `sdk` without hand-editing managed hashes.
- [ ] AC-03: The complete managed set is adopted atomically and governance
- [x] AC-03: The complete managed set is adopted atomically and governance
passes before ticket-063 enters `EDIT`.
- [x] AC-04: No application or test behavior changes in this ticket.

Expand All @@ -34,9 +34,9 @@ the required upstream extension/adoption instead of modifying authority.

## Approval gate

The human approved the protected routing plan on 2026-08-09. The ticket remains
non-active and makes no authority change while it waits for a published
upstream mechanism or existing supported extension.
The human approved the protected routing plan on 2026-08-09. The ticket
remained non-active and made no authority change while it waited for the
published upstream mechanism.

The matching upstream owner is the existing
`wellmanifest/new-project:ticket-024`; no competing governance ticket was
Expand Down Expand Up @@ -97,6 +97,15 @@ adopted a published upstream mechanism and governance passes.
cannot validate the new `extendable` strategy. The ticket returned to
`EDIT` and now binds both the reusable workflow and its `standard-ref` input
to the adopted exact v0.14.0 SHA `a22eb47`.
- Fresh exact head `b33e49ce2d90bd13dc98961dbaf467172cd4a7c4`
passed verify, required Java, Koru and review-triggered governance. The
deterministic Validator approved it as decision `D-062-0715`; its advisory
LLM output was not used as authority.
- Protected PR #77 merged as
`a7625806a57ef859802eec47175653a6039c1c4a`. The immediate default-branch
governance run then failed closed because the merged ticket was still
active while a push event has no PR base. This docs-only closure marks the
completed adoption inactive; it does not change the adopted package.

## Non-goals

Expand Down
12 changes: 12 additions & 0 deletions project/ticket-062/ai-codex-logs.txt
Original file line number Diff line number Diff line change
Expand Up @@ -81,3 +81,15 @@ PASS ./project/governance-check.sh
ROOT .github/workflows/ci.yml still pinned uses and standard-ref to 85631ea
STATE returned to IN_PROGRESS / EDIT
REPAIR both caller references aligned to exact a22eb47

2026-08-09 protected completion
PASS exact head b33e49ce2d90bd13dc98961dbaf467172cd4a7c4 verify
PASS exact head required Java adapter
PASS exact head Koru code-review
PASS exact head review-triggered governance
APPROVED deterministic Validator D-062-0715
ADVISORY LLM REQUEST_CHANGES not used as authority
MERGED PR 77 as a7625806a57ef859802eec47175653a6039c1c4a
DIAGNOSTIC default-branch push lacks BASE_SHA while completed adoption ticket remained active
REPAIR closure sets ticket-062 DONE / DONE; adopted package stays unchanged
UNBLOCK ticket-063 may enter separately approved EDIT
14 changes: 11 additions & 3 deletions project/ticket-062/ai-codex.md
Original file line number Diff line number Diff line change
Expand Up @@ -50,14 +50,22 @@ or a supported project-extension mechanism.
`standard-ref` still selected v0.13.2, so that old parser rejected the
adopted package strategy with `GOV-SYNC-001`. Returned to `EDIT` and aligned
both immutable references with exact v0.14.0 SHA `a22eb47`.
- Fresh exact-head verify, Java, Koru, deterministic Validator decision
`D-062-0715` and review-triggered governance passed. PR #77 merged as
`a7625806a57ef859802eec47175653a6039c1c4a`.
- Recorded the expected post-merge push diagnostic caused by leaving a
completed `standardAdoption` ticket active without a PR base, then closed
the ticket as `DONE / DONE` so the record no longer participates in active
atomic-adoption resolution.
- Recorded the combined 059+060+061 validation: every pre-test gate passed and
the only observed test failure is the ticket-063 assertion blocked by this
ownership gap.
- Made no governance, implementation or test change.
- The initial routing phase made no governance, implementation or test change;
the approved delivery later changed only the governed adoption surfaces.
- Human approved the routing plan on 2026-08-09; its external release
dependency is now satisfied.

## Blockers

- Fresh protected checks and exact-head review remain after caller alignment.
Ticket-063 stays blocked until this adoption reaches protected `main`.
- None. The adopted ownership is on protected `main`; ticket-063 may enter
`EDIT` under its separately approved scope.
10 changes: 10 additions & 0 deletions project/ticket-062/changelog.md
Original file line number Diff line number Diff line change
Expand Up @@ -36,3 +36,13 @@
parser against the adopted v0.14.0 package contract.
- Returned to `EDIT`, expanded the ordinary adoption budget from two to three
files, and aligned both workflow references to exact SHA `a22eb47`.

## [0.5.0] - 2026-08-09

- Passed fresh verify, Java, Koru, deterministic exact-head Validator and
review-triggered governance on final head `b33e49c`.
- Merged protected PR #77 as `main@a762580` and recorded the transient
no-PR-base push diagnostic while the completed adoption ticket remained
active.
- Completed all acceptance criteria and closed the ticket as `DONE / DONE`,
unblocking ticket-063.
Loading